Challenge
The project required the delivery of multiple water and fire service connections within a compressed timeframe as construction works neared completion.
The site presented varying ground conditions, with several services requiring specialist rock boring while others could be installed through open-cut excavation methods. Coordinating the installation of a range of water infrastructure assets while maintaining project timelines required a responsive and highly efficient delivery approach.